Milton Crow Lake No 1

Tr-Keatchie Bayou· Caddo, Louisiana· Built 1965· Earth· 16 ft tall
Low Hazard Recreation Private

Key Takeaway

Milton Crow Lake No 1 is classified as low hazard in Louisiana. It was completed in 1965 and is 61 years old. Its primary use is recreation.

Physical Details

Dam Height 16 ft (taller than 41% in LA)
Dam Length1,010 ft
Dam TypeEarth
Max Storage400 acre-ft
Normal Storage200 acre-ft
Surface Area20 acres
Drainage Area1 sq mi
Max Discharge589 cfs
Year Completed1965 (61 years old)
NID IDLA00308

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: November 10, 2020
State Regulated: Yes
Regulatory Agency: LA DOTD

Ownership

Milton Crow Family Partnership

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Milton Crow Lake No 1?

Milton Crow Lake No 1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Milton Crow Lake No 1?

Milton Crow Lake No 1 is owned by Milton Crow Family Partnership (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Milton Crow Lake No 1 built?

Milton Crow Lake No 1 was completed in 1965, making it 61 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Milton Crow Lake No 1?

Milton Crow Lake No 1 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Milton Crow Lake No 1?

Milton Crow Lake No 1 has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Milton Crow Lake No 1 last inspected?

Milton Crow Lake No 1 was last inspected on November 10, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.