Mildred White Crystal Lake Dam
Key Takeaway
Mildred White Crystal Lake Dam is classified as high hazard in North Carolina. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 999 ft |
| Dam Type | Earth |
| Max Storage | 48 acre-ft |
| Normal Storage | 15 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 207 sq mi |
| Max Discharge | 0 cfs |
| NID ID | NC06087 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Crystal Lake
Private
Nearby Dams
Charles Smith Dam
Cumberland, NC
High HazardNorth Lake Dam
Cumberland, NC
High HazardMultipurpose Trail Dam
Cumberland, NC
Significant HazardCollege Lake Dam
Cumberland, NC
High HazardCountry Club Lake Dam
Cumberland, NC
Low HazardRaynor Pond Dam
Cumberland, NC
Low HazardWooded Lake Dam
Cumberland, NC
Significant HazardCivitan Lake Dam
Cumberland, NC
High HazardFrequently Asked Questions
What is the hazard classification of Mildred White Crystal Lake Dam?
Mildred White Crystal Lake Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mildred White Crystal Lake Dam?
Mildred White Crystal Lake Dam is owned by Crystal Lake (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mildred White Crystal Lake Dam?
Mildred White Crystal Lake Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Mildred White Crystal Lake Dam last inspected?
Mildred White Crystal Lake Dam was last inspected on March 7, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.