Miami Lake Sediment Control Dam Site 3
Key Takeaway
Miami Lake Sediment Control Dam Site 3 is classified as low hazard in Iowa. It was completed in 1980 and is 46 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 32 ft (taller than 58.4% in IA) |
| Dam Length | 525 ft |
| Dam Type | Earth |
| Max Storage | 260 acre-ft |
| Normal Storage | 64 acre-ft |
| Surface Area | 10 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1980 (46 years old) |
| NID ID | IA02146 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Monroe County SWCD
Local Government
Nearby Dams
Miami Lake Sediment Control Dam Site 2
Monroe, IA
Low Hazard 33 ftLake Miami Sediment Contro Dam - South Site
Monroe, IA
Low Hazard 26 ftLake Miami Sediment Basin - Middle Site
Monroe, IA
Low Hazard 33 ftGardner Dam
Monroe, IA
Low Hazard 29 ftMiami Lake Sediment Control Dam Site 1
Monroe, IA
Low Hazard 35 ftLake Miami Dam
Monroe, IA
Significant Hazard 32 ftDavis Dam
Monroe, IA
Low Hazard 26 ftChelar Roadgrade Dam
Monroe, IA
Low Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Miami Lake Sediment Control Dam Site 3?
Miami Lake Sediment Control Dam Site 3 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Miami Lake Sediment Control Dam Site 3?
Miami Lake Sediment Control Dam Site 3 is owned by Monroe County SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Miami Lake Sediment Control Dam Site 3 built?
Miami Lake Sediment Control Dam Site 3 was completed in 1980, making it 46 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Miami Lake Sediment Control Dam Site 3?
Miami Lake Sediment Control Dam Site 3 serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Debris Control. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Miami Lake Sediment Control Dam Site 3?
Miami Lake Sediment Control Dam Site 3 has a dam height of 32 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Miami Lake Sediment Control Dam Site 3 last inspected?
Miami Lake Sediment Control Dam Site 3 was last inspected on March 1, 2006. Inspection dates indicate when a formal review occurred, not the results of that inspection.