Melrose Mountain Dam #2
Key Takeaway
Melrose Mountain Dam #2 is classified as high hazard in North Carolina. It was completed in 1972 and is 54 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 250 ft |
| Dam Type | Earth |
| Max Storage | 157 acre-ft |
| Normal Storage | 118 acre-ft |
| Surface Area | 8 acres |
| Drainage Area | 35 sq mi |
| Year Completed | 1972 (54 years old) |
| NID ID | NC00309 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
MRM Property Owners Association, Inc.
Private
Nearby Dams
Melrose Mountain Dam #1
Polk, NC
High HazardOld Tryon Water Suppy Dam
Polk, NC
High HazardRobin Smith Dam
Polk, NC
High HazardWoodpecker Lane Dam
Polk, NC
High HazardLittle Warrior Mountain Dam
Polk, NC
High HazardCade Dam
Polk, NC
High HazardJohnson/Tedder Pond Dam
Greenville, SC
Low Hazard 26 ftR Austin Gilbert Jr Dam
Greenville, SC
Low Hazard 38 ftFrequently Asked Questions
What is the hazard classification of Melrose Mountain Dam #2?
Melrose Mountain Dam #2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Melrose Mountain Dam #2?
Melrose Mountain Dam #2 is owned by MRM Property Owners Association, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Melrose Mountain Dam #2 built?
Melrose Mountain Dam #2 was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Melrose Mountain Dam #2?
Melrose Mountain Dam #2 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Melrose Mountain Dam #2 last inspected?
Melrose Mountain Dam #2 was last inspected on February 3, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.