Mclendon Creek Dam
Key Takeaway
Mclendon Creek Dam is classified as high hazard in North Carolina. It was completed in 2000 and is 26 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 1,660 ft |
| Dam Type | Earth |
| Max Storage | 3.2K acre-ft |
| Normal Storage | 2.9K acre-ft |
| Surface Area | 115 acres |
| Year Completed | 2000 (26 years old) |
| NID ID | NC05355 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
McLendon Hills Property Owners Association
Private
Nearby Dams
Seven Lakes Dam #7
Moore, NC
Low HazardSeven Lakes Dam #1
Moore, NC
High HazardSeven Lakes Dam #4
Moore, NC
High HazardSeven Lakes Dam #5
Moore, NC
High HazardJ.L. Frith Pond Dam #2
Moore, NC
High HazardSeven Lakes Dam #2
Moore, NC
High HazardThomas Blue Dam #2
Moore, NC
Low HazardSeven Lakes Dam #3
Moore, NC
High HazardFrequently Asked Questions
What is the hazard classification of Mclendon Creek Dam?
Mclendon Creek Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mclendon Creek Dam?
Mclendon Creek Dam is owned by McLendon Hills Property Owners Association (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Mclendon Creek Dam built?
Mclendon Creek Dam was completed in 2000, making it 26 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Mclendon Creek Dam?
Mclendon Creek Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Mclendon Creek Dam last inspected?
Mclendon Creek Dam was last inspected on February 28, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.