Mcelrath Lake Dam
Key Takeaway
Mcelrath Lake Dam is classified as significant hazard in North Carolina. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 85 ft |
| Dam Type | Earth |
| Max Storage | 40 acre-ft |
| Normal Storage | 0 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| NID ID | NC03004 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Rhonda Streadwick
Private
Nearby Dams
Curtis Ensley Dam
Buncombe, NC
Significant HazardSei Farms Dam
Henderson, NC
Significant HazardKimball Dam
Henderson, NC
Low HazardPowhatan
Buncombe, NC
High Hazard 23 ftSchmidt Pond Dam
Buncombe, NC
High HazardForge Mountain Grist Mill Dam
Henderson, NC
High HazardMoore Lake Dam
Buncombe, NC
Significant HazardPlemmons Pond Dam
Buncombe, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Mcelrath Lake Dam?
Mcelrath Lake Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mcelrath Lake Dam?
Mcelrath Lake Dam is owned by Rhonda Streadwick (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mcelrath Lake Dam?
Mcelrath Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Mcelrath Lake Dam last inspected?
Mcelrath Lake Dam was last inspected on January 23, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.