Lower Jr Grant
Key Takeaway
Lower Jr Grant is classified as low hazard in Maine. Its primary use is recreation.
Physical Details
| Dam Height | 26 ft (taller than 84.8% in ME) |
| Dam Length | 190 ft |
| Dam Type | Earth |
| Max Storage | 0 acre-ft |
| Normal Storage | 21 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 0 sq mi |
| NID ID | ME96008 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Jasper Wyman & Son
Private
Nearby Dams
Popple Hill Pond
Washington, ME
Low Hazard 9 ftMic-Mac
Washington, ME
Low Hazard 13 ftBog Brook
Washington, ME
Low Hazard 10 ftCherryfield
Washington, ME
High Hazard 25 ftPleasant River Lake
Washington, ME
Low Hazard 10 ftBarbless Pond
Hancock, ME
Low Hazard 8 ftLower Lead Mountain
Hancock, ME
Low Hazard 9 ftFrequently Asked Questions
What is the hazard classification of Lower Jr Grant?
Lower Jr Grant is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lower Jr Grant?
Lower Jr Grant is owned by Jasper Wyman & Son (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lower Jr Grant?
Lower Jr Grant serves the following purposes: Recreation, Other, Irrigation, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Lower Jr Grant?
Lower Jr Grant has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lower Jr Grant last inspected?
Lower Jr Grant was last inspected on May 2, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.