Lakewood Hills Lake Dam
Key Takeaway
Lakewood Hills Lake Dam is classified as significant hazard in Illinois. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Type | Earth |
| Normal Storage | 0 acre-ft |
| NID ID | IL50685 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
LAKEWOOD HILLS ASSOCIATION
Private
Nearby Dams
Page Park Dam
Winnebago, IL
High Hazard 41 ftLevings Lake Dam
Winnebago, IL
High Hazard 23 ftFordam Station Dam
Winnebago, IL
Low Hazard 12 ftRock River Water Reclamation District Excess Flow Basin Dam
Winnebago, IL
High Hazard 8 ftAlpine Dam
Winnebago, IL
High Hazard 48 ftSpring Lake Dam
Winnebago, IL
Significant Hazard 10 ftPebble Creek Dam
Winnebago, IL
High Hazard 21 ftCoolidge Creek Dam
Winnebago, IL
Low Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Lakewood Hills Lake Dam?
Lakewood Hills Lake Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lakewood Hills Lake Dam?
Lakewood Hills Lake Dam is owned by LAKEWOOD HILLS ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lakewood Hills Lake Dam?
Lakewood Hills Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Lakewood Hills Lake Dam last inspected?
Lakewood Hills Lake Dam was last inspected on July 13, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.