Lake Forest Dam #2
Key Takeaway
Lake Forest Dam #2 is classified as significant hazard in Missouri. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 43 ft (taller than 91.5% in MO) |
| Dam Length | 200 ft |
| Dam Type | Earth |
| Max Storage | 25 acre-ft |
| Normal Storage | 20 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| NID ID | MO40156 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Lake Forest Estates Dam
Jefferson, MO
High Hazard 38 ftLiguori Lake Dam - Nonane 255
Jefferson, MO
High Hazard 25 ftAtwood Lake Dam
Jefferson, MO
High Hazard 27 ftBooth Lake Dam
Jefferson, MO
High Hazard 29 ftTeamsters Dam
Jefferson, MO
High Hazard 25 ftSchaefer Lake Dam
Jefferson, MO
Low Hazard 24 ftLake Horine Dam
Jefferson, MO
Low Hazard 22 ftWindsor Lake Dam
Jefferson, MO
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Lake Forest Dam #2?
Lake Forest Dam #2 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lake Forest Dam #2?
Lake Forest Dam #2 is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
How tall is Lake Forest Dam #2?
Lake Forest Dam #2 has a dam height of 43 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lake Forest Dam #2 last inspected?
Lake Forest Dam #2 was last inspected on February 9, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.