Keen Pond Dam
Key Takeaway
Keen Pond Dam is classified as low hazard in Louisiana. Its primary use is recreation.
Physical Details
| Dam Height | 11 ft (taller than 16.4% in LA) |
| Dam Length | 760 ft |
| Dam Type | Earth |
| Max Storage | 198 acre-ft |
| Normal Storage | 144 acre-ft |
| Surface Area | 36 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 780 cfs |
| NID ID | LA00512 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
David Lawler;Matt Lummus
Private
Nearby Dams
Blanchard Lake
Caddo, LA
Low Hazard 15 ftFish Lake Dam
Caddo, LA
Low Hazard 13 ftNorthwood Hills Country Club Pond
Caddo, LA
Significant Hazard 15 ftCaddo Dam
Caddo, LA
Low Hazard 36 ftPleasant Grove Lake
Caddo, LA
Low Hazard 18 ftOneal Pond
Caddo, LA
Low Hazard 14 ftBankston Pond
Caddo, LA
Low Hazard 26 ftEvening Star Lake
Caddo, LA
Low Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Keen Pond Dam?
Keen Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Keen Pond Dam?
Keen Pond Dam is owned by David Lawler;Matt Lummus (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Keen Pond Dam?
Keen Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Keen Pond Dam?
Keen Pond Dam has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Keen Pond Dam last inspected?
Keen Pond Dam was last inspected on May 6, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.