Key Takeaway
Jones is classified as high hazard in Utah. It was completed in 1956 and is 70 years old. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 450 ft |
| Dam Type | Earth |
| Max Storage | 228 acre-ft |
| Normal Storage | 176 acre-ft |
| Drainage Area | 1 sq mi |
| Year Completed | 1956 (70 years old) |
| NID ID | UT00156 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TWIN CREEKS SPECIAL SERVICE DISTRICT
Private
Nearby Dams
Witt Lake
Wasatch, UT
High HazardDeer Valley
Wasatch, UT
High HazardLindsay (Bennett) Lower
Wasatch, UT
High HazardAnderson (Kenneth)
Wasatch, UT
Significant HazardClegg Lake (Aka Clyde Lake)
Wasatch, UT
Significant HazardChristensen (Russell)
Wasatch, UT
Significant HazardMoose Spring LLC
Wasatch, UT
Significant HazardCenter Creek No. 3
Wasatch, UT
High HazardFrequently Asked Questions
What is the hazard classification of Jones?
Jones is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Jones?
Jones is owned by TWIN CREEKS SPECIAL SERVICE DISTRICT (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Jones built?
Jones was completed in 1956, making it 70 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Jones?
Jones serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Jones last inspected?
Jones was last inspected on August 29, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.