Joe Suggs Farm Lagoon Dam
Key Takeaway
Joe Suggs Farm Lagoon Dam is classified as significant hazard in North Carolina. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 775 ft |
| Dam Type | Earth |
| Max Storage | 112 acre-ft |
| Surface Area | 3 acres |
| NID ID | NC05280 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Joe Suggs
Private
Nearby Dams
Etheridge Dam
Edgecombe, NC
Low HazardHanor Sow Lagoon Dam
Edgecombe, NC
Significant HazardHanor Swine Topping Lagoon Dam
Edgecombe, NC
Significant HazardGammon Lake Dam
Edgecombe, NC
Low HazardFishing Creek Millpond Dam
Nash, NC
Low HazardBellamy Lake Dam
Halifax, NC
Low HazardSteve Harper Lagoon Dam
Edgecombe, NC
Significant HazardHoerners Waldorf Pond Dam
Halifax, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Joe Suggs Farm Lagoon Dam?
Joe Suggs Farm Lagoon Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Joe Suggs Farm Lagoon Dam?
Joe Suggs Farm Lagoon Dam is owned by Joe Suggs (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Joe Suggs Farm Lagoon Dam?
Joe Suggs Farm Lagoon Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Joe Suggs Farm Lagoon Dam last inspected?
Joe Suggs Farm Lagoon Dam was last inspected on January 19, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.