Jackson Pond Dam
Key Takeaway
Jackson Pond Dam is classified as significant hazard in North Carolina. Its primary use is fire protection. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 240 ft |
| Dam Type | Earth |
| Max Storage | 10 acre-ft |
| Surface Area | 1 acres |
| NID ID | NC04914 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Chris Jackson
Private
Nearby Dams
Dobson Dam
Orange, NC
Significant HazardFaircloth Lake Dam
Chatham, NC
Low HazardCedar Village Lake Dam
Chatham, NC
Low HazardBriar Chapel Reclamation Facility Central Pond Dam
Chatham, NC
Significant HazardUniversity Lake Dam
Orange, NC
High HazardBriar Chapel Reclamation Facility 5-Day Upset Pond Dam
Chatham, NC
High HazardGovernors Club Dam #6
Chatham, NC
High HazardGovernors Club Dam #7
Chatham, NC
High HazardFrequently Asked Questions
What is the hazard classification of Jackson Pond Dam?
Jackson Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Jackson Pond Dam?
Jackson Pond Dam is owned by Chris Jackson (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Jackson Pond Dam?
Jackson Pond Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Jackson Pond Dam last inspected?
Jackson Pond Dam was last inspected on December 16, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.