Hussey Lake Dam
Key Takeaway
Hussey Lake Dam is classified as low hazard in North Carolina. It was completed in 1970 and is 56 years old. Its primary use is recreation.
Physical Details
| Dam Length | 270 ft |
| Dam Type | Earth |
| Max Storage | 55 acre-ft |
| Normal Storage | 48 acre-ft |
| Surface Area | 4 acres |
| Max Discharge | 82 cfs |
| Year Completed | 1970 (56 years old) |
| NID ID | NC00755 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Paul Settle
Private
Nearby Dams
Ott Lake Dam
Montgomery, NC
Low HazardRegister Dam
Montgomery, NC
Low HazardBaldwin Lake Dam
Montgomery, NC
Low HazardMcduffie Lake Dam
Moore, NC
Low HazardMccauley Lake Dam
Montgomery, NC
Low HazardHarris Lake Dam
Moore, NC
Low HazardCandor Wastewater Dam
Montgomery, NC
Low HazardFoster Lake Dam
Montgomery, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Hussey Lake Dam?
Hussey Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hussey Lake Dam?
Hussey Lake Dam is owned by Paul Settle (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hussey Lake Dam built?
Hussey Lake Dam was completed in 1970, making it 56 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hussey Lake Dam?
Hussey Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Hussey Lake Dam last inspected?
Hussey Lake Dam was last inspected on December 15, 2009. Inspection dates indicate when a formal review occurred, not the results of that inspection.