Hurley Pond Dam is classified as significant hazard in New Jersey. It was completed in 1915 and is 111 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 6 ft (taller than 0.6% in NJ) |
| Dam Length | 400 ft |
| Dam Type | Earth |
| Normal Storage | 52 acre-ft |
| Surface Area | 10 acres |
| Drainage Area | 4 sq mi |
| Year Completed | 1915 (111 years old) |
| NID ID | NJ00754 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Monmouth County Engineering
Local Government
Nearby Dams
Glendola Reservoir Dam
Monmouth, NJ
High Hazard 65 ftJumping Brook Dam
Monmouth, NJ
Low Hazard 10 ftOsborns Mills Dam
Monmouth, NJ
Significant Hazard 12 ftBrisbane Lake Dam
Monmouth, NJ
Significant Hazard 14 ftWetland Area I-2 Dam
Monmouth, NJ
Low Hazard 9 ftOld Mill Pond Dam
Monmouth, NJ
Significant Hazard 15 ftStabilization/Leveling Pond Dam
Monmouth, NJ
Low Hazard 10 ftBtmua Reservoir Dam
Ocean, NJ
High Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Hurley Pond Dam?
Hurley Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hurley Pond Dam?
Hurley Pond Dam is owned by Monmouth County Engineering (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hurley Pond Dam built?
Hurley Pond Dam was completed in 1915, making it 111 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hurley Pond Dam?
Hurley Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Hurley Pond Dam?
Hurley Pond Dam has a dam height of 6 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Hurley Pond Dam last inspected?
Hurley Pond Dam was last inspected on December 9, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.