Huntington Cleveland - Upper Pond
Key Takeaway
Huntington Cleveland - Upper Pond is classified as significant hazard in Utah. It was completed in 2011 and is 15 years old. Its primary use is irrigation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 1,250 ft |
| Dam Type | Earth |
| Max Storage | 505 acre-ft |
| Normal Storage | 408 acre-ft |
| Drainage Area | 1 sq mi |
| Max Discharge | 76 cfs |
| Year Completed | 2011 (15 years old) |
| NID ID | UT53579 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
HUNTINGTON CLEVELAND IRRIGATION CO
Private
Nearby Dams
Nielson (John)
Emery, UT
Significant HazardHuntington North
Emery, UT
High HazardPacificorp - Huntington Irrigation Pond
Emery, UT
Significant HazardLawrence South Irrigation-Pond #2
Emery, UT
Low HazardWilberg #1 (Northern)
Emery, UT
Significant HazardPacificorp - Huntington Settling Pond
Emery, UT
Significant HazardWilberg #2 (Middle, Old Dam)
Emery, UT
Significant HazardWilberg #3 (South, New Dam)
Emery, UT
Significant HazardFrequently Asked Questions
What is the hazard classification of Huntington Cleveland - Upper Pond?
Huntington Cleveland - Upper Pond is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Huntington Cleveland - Upper Pond?
Huntington Cleveland - Upper Pond is owned by HUNTINGTON CLEVELAND IRRIGATION CO (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Huntington Cleveland - Upper Pond built?
Huntington Cleveland - Upper Pond was completed in 2011, making it 15 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Huntington Cleveland - Upper Pond?
Huntington Cleveland - Upper Pond serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Huntington Cleveland - Upper Pond last inspected?
Huntington Cleveland - Upper Pond was last inspected on June 30, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.