Huneycutt Pig Farm Ag Service Pond Dam
Key Takeaway
Huneycutt Pig Farm Ag Service Pond Dam is classified as high hazard in North Carolina. Its primary use is fish and wildlife pond. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 309 ft |
| Dam Type | Earth |
| Max Storage | 29 acre-ft |
| Normal Storage | 17 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 31 sq mi |
| NID ID | NC06252 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Todd Huneycutt
Private
Nearby Dams
Celisa Farm Dam #1
Stanly, NC
Low HazardHatley Pond Dam
Stanly, NC
Low HazardBrooks Dam
Stanly, NC
High HazardLong Lake Dam
Stanly, NC
High HazardMartin Dam
Stanly, NC
High HazardLowder Pond Dam
Stanly, NC
High HazardSpring Lake Garden Dam
Stanly, NC
High HazardHinson Pond Dam
Stanly, NC
High HazardFrequently Asked Questions
What is the hazard classification of Huneycutt Pig Farm Ag Service Pond Dam?
Huneycutt Pig Farm Ag Service Pond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Huneycutt Pig Farm Ag Service Pond Dam?
Huneycutt Pig Farm Ag Service Pond Dam is owned by Todd Huneycutt (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Huneycutt Pig Farm Ag Service Pond Dam?
Huneycutt Pig Farm Ag Service Pond Dam serves the following purposes: Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Huneycutt Pig Farm Ag Service Pond Dam last inspected?
Huneycutt Pig Farm Ag Service Pond Dam was last inspected on March 16, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.