Hugh Chatham Hospital Dam
Key Takeaway
Hugh Chatham Hospital Dam is classified as high hazard in North Carolina. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 325 ft |
| Dam Type | Earth |
| Max Storage | 171 acre-ft |
| Normal Storage | 109 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 62 sq mi |
| Max Discharge | 130 cfs |
| Year Modified | 1999 |
| NID ID | NC04296 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Hugh Chatham Memorial Hospital
Private
Nearby Dams
Elkin Reservoir Dam
Surry, NC
High HazardJonesville Raw Water Dam
Yadkin, NC
Low HazardWillowbrook Carp Lake Dam
Surry, NC
High HazardKlondike Farm Dam
Surry, NC
High HazardCedar Brook Lake Dam
Surry, NC
High HazardJonesville Golf Course Dam
Yadkin, NC
Low HazardHighland Orchards Dam
Yadkin, NC
High HazardHighland Orchard Dam
Yadkin, NC
High HazardFrequently Asked Questions
What is the hazard classification of Hugh Chatham Hospital Dam?
Hugh Chatham Hospital Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hugh Chatham Hospital Dam?
Hugh Chatham Hospital Dam is owned by Hugh Chatham Memorial Hospital (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Hugh Chatham Hospital Dam?
Hugh Chatham Hospital Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Hugh Chatham Hospital Dam last inspected?
Hugh Chatham Hospital Dam was last inspected on February 7, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.