Howard Pond Dam
Key Takeaway
Howard Pond Dam is classified as significant hazard in North Carolina. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 0 ft |
| Dam Type | Earth |
| Max Storage | 19 acre-ft |
| Normal Storage | 19 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 56 sq mi |
| Max Discharge | 0 cfs |
| NID ID | NC05564 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
D.R. Horton
Private
Nearby Dams
Cross Country Lake Dam
Catawba, NC
Significant HazardJones Lake Dam
Catawba, NC
High HazardMarshall Retention Basin Dam
Catawba, NC
High HazardMarshall Holding Basin Dam
Catawba, NC
High HazardLittle Mountain Farms Upper Dam
Catawba, NC
Significant HazardLincoln Raw Water Reservoir Dam
Lincoln, NC
Significant HazardLittle Mountain Aircraft Lake Dam
Catawba, NC
Low HazardCatfish Lake Dam
Lincoln, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Howard Pond Dam?
Howard Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Howard Pond Dam?
Howard Pond Dam is owned by D.R. Horton (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Howard Pond Dam?
Howard Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Howard Pond Dam last inspected?
Howard Pond Dam was last inspected on February 7, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.