Hedingham Dam #2 is classified as high hazard in North Carolina. It was completed in 1990 and is 36 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 0 ft |
| Dam Type | Earth |
| Max Storage | 50 acre-ft |
| Year Completed | 1990 (36 years old) |
| NID ID | NC04927 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Gregory D Grabus
Private
Nearby Dams
Hedingham Dam #1
Wake, NC
High HazardBabcock Lake Dam
Wake, NC
Low HazardMilburnie Fish Club Lake Dam
Wake, NC
Significant HazardTurfgrass Lake Dam #3
Wake, NC
High HazardTurfgrass Lake Dam #2
Wake, NC
Low HazardTurf Grass Farm Dam #4
Wake, NC
Low HazardTurfgrass Lake Dam #1
Wake, NC
Low HazardAllen Trust Dam
Wake, NC
High HazardFrequently Asked Questions
What is the hazard classification of Hedingham Dam #2?
Hedingham Dam #2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Hedingham Dam #2?
Hedingham Dam #2 is owned by Gregory D Grabus (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Hedingham Dam #2 built?
Hedingham Dam #2 was completed in 1990, making it 36 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Hedingham Dam #2?
Hedingham Dam #2 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Hedingham Dam #2 last inspected?
Hedingham Dam #2 was last inspected on November 20, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.