Harrington Lake
Key Takeaway
Harrington Lake is classified as low hazard in Maine. It was completed in 1930 and is 96 years old. Its primary use is hydroelectric.
Physical Details
| Dam Height | 16 ft (taller than 59.6% in ME) |
| Dam Length | 1,905 ft |
| Dam Type | Concrete |
| Max Storage | 7.7K acre-ft |
| Normal Storage | 7.7K acre-ft |
| Surface Area | 1,178 acres |
| Drainage Area | 40 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1930 (96 years old) |
| NID ID | ME00208 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Not Listed
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Harrington Lake?
Harrington Lake is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Harrington Lake?
Harrington Lake is owned by information not available (Not Listed). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Harrington Lake built?
Harrington Lake was completed in 1930, making it 96 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Harrington Lake?
Harrington Lake serves the following purposes: Hydroelectric, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Harrington Lake?
Harrington Lake has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Harrington Lake last inspected?
Harrington Lake was last inspected on July 12, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.