Gourley Lake Dam
Key Takeaway
Gourley Lake Dam is classified as low hazard in North Carolina. It was completed in 1978 and is 48 years old. Its primary use is other.
Physical Details
| Dam Length | 155 ft |
| Dam Type | Earth |
| Max Storage | 19 acre-ft |
| Normal Storage | 20 acre-ft |
| Surface Area | 3 acres |
| Year Completed | 1978 (48 years old) |
| NID ID | NC01400 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Jamie Milam-Roberts
Private
Nearby Dams
Bernard Dam
Caswell, NC
Low HazardGrubb Dam
Pittsylvania, VA
Low Hazard 28 ftBryant Dam
Pittsylvania, VA
Unknown 26 ftWhite Dam
Caswell, NC
Low HazardSouth of Danville Dam
Danville, VA
Unknown 28 ftWomble Lower Dam
Caswell, NC
Low HazardSellers Dam
Pittsylvania, VA
Unknown 27 ftIndustrial Authority Dam
Pittsylvania, VA
Unknown 29 ftFrequently Asked Questions
What is the hazard classification of Gourley Lake Dam?
Gourley Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Gourley Lake Dam?
Gourley Lake Dam is owned by Jamie Milam-Roberts (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Gourley Lake Dam built?
Gourley Lake Dam was completed in 1978, making it 48 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Gourley Lake Dam?
Gourley Lake Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Gourley Lake Dam last inspected?
Gourley Lake Dam was last inspected on December 10, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.