Galloway Dam
Key Takeaway
Galloway Dam is classified as low hazard in North Carolina. It was completed in 1982 and is 44 years old. Its primary use is recreation.
Physical Details
| Dam Length | 260 ft |
| Dam Type | Earth |
| Max Storage | 21 acre-ft |
| Normal Storage | 12 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 27 sq mi |
| Max Discharge | 60 cfs |
| Year Completed | 1982 (44 years old) |
| NID ID | NC02471 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
James Galloway Jr.
Private
Nearby Dams
Lissara Dam
Forsyth, NC
Low HazardConrad Lake Dam
Forsyth, NC
High HazardDurham Lake Dam
Forsyth, NC
Low HazardSatterfield Dam #1
Forsyth, NC
Low HazardSatterfield Dam #4
Forsyth, NC
Low HazardSatterfield Dam #3
Forsyth, NC
Low HazardNeely Dam
Forsyth, NC
Low HazardMessick Lake Dam
Forsyth, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Galloway Dam?
Galloway Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Galloway Dam?
Galloway Dam is owned by James Galloway Jr. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Galloway Dam built?
Galloway Dam was completed in 1982, making it 44 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Galloway Dam?
Galloway Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Galloway Dam last inspected?
Galloway Dam was last inspected on November 12, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.