Fitch Basin Dam
Key Takeaway
Fitch Basin Dam is classified as significant hazard in Massachusetts. It was completed in 1928 and is 98 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 15 ft (taller than 48.8% in MA) |
| Dam Length | 575 ft |
| Dam Type | Earth |
| Max Storage | 114 acre-ft |
| Normal Storage | 93 acre-ft |
| Surface Area | 12 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1928 (98 years old) |
| NID ID | MA01307 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TOWN OF CLINTON, DEPARTMENT OF PUBLIC WORKS
Local Government
Nearby Dams
Upper Lynde Basin Dam
Worcester, MA
Significant Hazard 15 ftHeywood Reservoir Dam
Worcester, MA
Significant Hazard 28 ftHycrest Farm Pond Dam
Worcester, MA
Significant Hazard 11 ftFall Brook Reservoir Dam and Dike
Worcester, MA
High Hazard 37 ftPratt's Pond Dam
Worcester, MA
Significant Hazard 11 ftLake Samoset Dam
Worcester, MA
High Hazard 24 ftBartlett Pond Dam
Worcester, MA
Significant Hazard 12 ftHaynes Reservoir Dam
Worcester, MA
Significant Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Fitch Basin Dam?
Fitch Basin Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Fitch Basin Dam?
Fitch Basin Dam is owned by TOWN OF CLINTON, DEPARTMENT OF PUBLIC WORKS (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Fitch Basin Dam built?
Fitch Basin Dam was completed in 1928, making it 98 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Fitch Basin Dam?
Fitch Basin Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Fitch Basin Dam?
Fitch Basin Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Fitch Basin Dam last inspected?
Fitch Basin Dam was last inspected on November 27, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.