Fire Mountain Boy Scout Camp Dam C

Tr - Walker Creek· Skagit, Washington· Built 1971· Earth·
High Hazard Recreation Private

Key Takeaway

Fire Mountain Boy Scout Camp Dam C is classified as high hazard in Washington. It was completed in 1971 and is 55 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Length400 ft
Dam TypeEarth
Max Storage350 acre-ft
Normal Storage250 acre-ft
Surface Area33 acres
Drainage Area0 sq mi
Max Discharge0 cfs
Year Completed1971 (55 years old)
NID IDWA00384

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: October 27, 2023
State Regulated: Yes
Regulatory Agency: Washington Dept of Ecology

Ownership

Boy Scouts of America Mt Baker Council

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Fire Mountain Boy Scout Camp Dam C?

Fire Mountain Boy Scout Camp Dam C is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Fire Mountain Boy Scout Camp Dam C?

Fire Mountain Boy Scout Camp Dam C is owned by Boy Scouts of America Mt Baker Council (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Fire Mountain Boy Scout Camp Dam C built?

Fire Mountain Boy Scout Camp Dam C was completed in 1971, making it 55 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Fire Mountain Boy Scout Camp Dam C?

Fire Mountain Boy Scout Camp Dam C serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Fire Mountain Boy Scout Camp Dam C last inspected?

Fire Mountain Boy Scout Camp Dam C was last inspected on October 27, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.