Key Takeaway
Finney Branch Embankment is classified as significant hazard in West Virginia. It was completed in 1971 and is 55 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 28 ft (taller than 21.1% in WV) |
| Dam Length | 650 ft |
| Dam Type | Other |
| Max Storage | 180 acre-ft |
| Normal Storage | 0 acre-ft |
| Drainage Area | 14 sq mi |
| Year Completed | 1971 (55 years old) |
| NID ID | WV03923 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
HATFIELD ENTERPRISES
Private
Nearby Dams
Cunningham Flyash Pond
Kanawha, WV
Significant Hazard 31 ftAnderson Dam
Kanawha, WV
High Hazard 39 ftFly Ash Settling Basin Dam
Kanawha, WV
High Hazard 28 ftWard Impoundment (Lower) Dam
Kanawha, WV
Significant Hazard 152 ftLake Chaweva Dam
Kanawha, WV
High Hazard 36 ftWard Impoundment (Upper) Dam
Kanawha, WV
High Hazard 139 ftHolz Dam
Kanawha, WV
High Hazard 203 ftBlake's Creek Site No.7
Kanawha, WV
High Hazard 46 ftFrequently Asked Questions
What is the hazard classification of Finney Branch Embankment?
Finney Branch Embankment is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Finney Branch Embankment?
Finney Branch Embankment is owned by HATFIELD ENTERPRISES (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Finney Branch Embankment built?
Finney Branch Embankment was completed in 1971, making it 55 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Finney Branch Embankment?
Finney Branch Embankment serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Finney Branch Embankment?
Finney Branch Embankment has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Finney Branch Embankment last inspected?
Finney Branch Embankment was last inspected on March 27, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.