Fgh3 Fort Green Mine
Key Takeaway
Fgh3 Fort Green Mine is classified as significant hazard in Florida. It was completed in 1980 and is 46 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 40 ft (taller than 79.9% in FL) |
| Dam Length | 28,790 ft |
| Dam Type | Earth |
| Max Storage | 38.0K acre-ft |
| Normal Storage | 35.0K acre-ft |
| Surface Area | 1,000 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 60 cfs |
| Year Completed | 1980 (46 years old) |
| NID ID | FL11054 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
THE MOSAIC COMPANY
Private
Nearby Dams
Fgh2 Fort Green Mine
Hardee, FL
Significant Hazard 40 ftPol12
Hardee, FL
Unknown 7 ftFgh1a Fort Green Mine
Hardee, FL
Significant Hazard 35 ftF3a Four Corners Mine
Manatee, FL
Significant Hazard 65 ftMosaic Csa Fc2c
Hillsborough, FL
Significant Hazard 55 ftMosaic Csa F2c
Hillsborough, FL
Significant Hazard 55 ftMosaic Csa F2b
Hillsborough, FL
Significant Hazard 55 ftFort Green Fg-1
Polk, FL
Significant Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Fgh3 Fort Green Mine?
Fgh3 Fort Green Mine is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Fgh3 Fort Green Mine?
Fgh3 Fort Green Mine is owned by THE MOSAIC COMPANY (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Fgh3 Fort Green Mine built?
Fgh3 Fort Green Mine was completed in 1980, making it 46 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Fgh3 Fort Green Mine?
Fgh3 Fort Green Mine serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Fgh3 Fort Green Mine?
Fgh3 Fort Green Mine has a dam height of 40 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Fgh3 Fort Green Mine last inspected?
Fgh3 Fort Green Mine was last inspected on January 23, 2006. Inspection dates indicate when a formal review occurred, not the results of that inspection.