Fairfield Sewage Equalization Basin - Lagoon 2
Key Takeaway
Fairfield Sewage Equalization Basin - Lagoon 2 is classified as significant hazard in Washington. It was completed in 1966 and is 60 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 650 ft |
| Dam Type | Earth |
| Max Storage | 18 acre-ft |
| Normal Storage | 13 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1966 (60 years old) |
| NID ID | WA01528 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Fairfield City
Local Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Fairfield Sewage Equalization Basin - Lagoon 2?
Fairfield Sewage Equalization Basin - Lagoon 2 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Fairfield Sewage Equalization Basin - Lagoon 2?
Fairfield Sewage Equalization Basin - Lagoon 2 is owned by Fairfield City (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Fairfield Sewage Equalization Basin - Lagoon 2 built?
Fairfield Sewage Equalization Basin - Lagoon 2 was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Fairfield Sewage Equalization Basin - Lagoon 2?
Fairfield Sewage Equalization Basin - Lagoon 2 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Fairfield Sewage Equalization Basin - Lagoon 2 last inspected?
Fairfield Sewage Equalization Basin - Lagoon 2 was last inspected on October 17, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.