Physical Details

Dam Height 45 ft (taller than 77.9% in NV)
Dam Length900 ft
Dam TypeEarth
Max Storage216 acre-ft
Normal Storage184 acre-ft
Surface Area11 acres
Drainage Area0 sq mi
Max Discharge0 cfs
Year Completed2012 (14 years old)
NID IDNV10667

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: June 6, 2019
State Regulated: Yes
Regulatory Agency: NEVADA DWR

Ownership

NEVADA GOLD MINES LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Emigrant Process Ponds Dam?

Emigrant Process Ponds Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Emigrant Process Ponds Dam?

Emigrant Process Ponds Dam is owned by NEVADA GOLD MINES LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Emigrant Process Ponds Dam built?

Emigrant Process Ponds Dam was completed in 2012, making it 14 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Emigrant Process Ponds Dam?

Emigrant Process Ponds Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Emigrant Process Ponds Dam?

Emigrant Process Ponds Dam has a dam height of 45 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Emigrant Process Ponds Dam last inspected?

Emigrant Process Ponds Dam was last inspected on June 6, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.