Eden Presettling Impoundment Dam is classified as high hazard in North Carolina. It was completed in 1979 and is 47 years old. Its primary use is water supply. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 850 ft |
| Dam Type | Earth |
| Max Storage | 107 acre-ft |
| Normal Storage | 101 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 16 sq mi |
| Year Completed | 1979 (47 years old) |
| NID ID | NC01604 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Eden
Local Government
Nearby Dams
Dan River Service Water Settling Pond Dam
Rockingham, NC
Low HazardSmiths Lake Dam #1
Rockingham, NC
High HazardSmiths Lake Dam #2
Rockingham, NC
High HazardJohn Smith Lake Dam
Rockingham, NC
High HazardWright Dam
Rockingham, NC
Low HazardMitchell Dam
Rockingham, NC
Low HazardLake Miller Dam
Rockingham, NC
Low HazardSharp'S Lake Dam
Rockingham, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Eden Presettling Impoundment Dam?
Eden Presettling Impoundment Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Eden Presettling Impoundment Dam?
Eden Presettling Impoundment Dam is owned by City of Eden (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Eden Presettling Impoundment Dam built?
Eden Presettling Impoundment Dam was completed in 1979, making it 47 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Eden Presettling Impoundment Dam?
Eden Presettling Impoundment Dam serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Eden Presettling Impoundment Dam last inspected?
Eden Presettling Impoundment Dam was last inspected on April 13, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.