Eddington-Holbrook

Davis Pond· Penobscot, Maine· Built 1802· Concrete· 8 ft tall
Low Hazard Recreation Private

Key Takeaway

Eddington-Holbrook is classified as low hazard in Maine. It was completed in 1802 and is 224 years old. Its primary use is recreation.

Physical Details

Dam Height 8 ft (taller than 4.6% in ME)
Dam Length150 ft
Dam TypeConcrete
Max Storage2.1K acre-ft
Normal Storage1.5K acre-ft
Surface Area501 acres
Drainage Area0 sq mi
Year Completed1802 (224 years old)
NID IDME96053

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: October 17, 2018
State Regulated: Yes
Regulatory Agency: MEMA

Ownership

Eddington-Holbrook Dam, Inc.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Eddington-Holbrook?

Eddington-Holbrook is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Eddington-Holbrook?

Eddington-Holbrook is owned by Eddington-Holbrook Dam, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Eddington-Holbrook built?

Eddington-Holbrook was completed in 1802, making it 224 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Eddington-Holbrook?

Eddington-Holbrook serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Eddington-Holbrook?

Eddington-Holbrook has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Eddington-Holbrook last inspected?

Eddington-Holbrook was last inspected on October 17, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.