Key Takeaway
E Fork Pt Remove Creek Wid Site 04 is classified as significant hazard in Arkansas. It was completed in 1967 and is 59 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 46 ft (taller than 79.8% in AR) |
| Dam Length | 1,184 ft |
| Dam Type | Earth |
| Max Storage | 3.3K acre-ft |
| Normal Storage | 165 acre-ft |
| Surface Area | 31 acres |
| Drainage Area | 6 sq mi |
| Max Discharge | 3,907 cfs |
| Year Completed | 1967 (59 years old) |
| NID ID | AR00318 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
POINT REMOVE CREEK WATERSHED IMPROVEMENT DISTRICT
Local Government
Nearby Dams
E Fork Pt Remove Creek Wid Site 06
Conway, AR
Significant Hazard 60 ftE Fork Pt Remove Creek Wid Site 05
Conway, AR
Low Hazard 56 ftE Fork Pt Remove Creek Wid Site 07
Conway, AR
Low Hazard 52 ftE Fork Pt Remove Creek Wid Site 03
Conway, AR
Low Hazard 48 ftW Fork Pt Remove Creek Wid Site 02
Conway, AR
Low Hazard 43 ftE Fork Pt Remove Creek Wid Site 08
Conway, AR
Significant Hazard 49 ftW Fork Pt Remove Creek Wid Site 01
Van Buren, AR
Low Hazard 46 ftW Fork Pt Remove Creek Wid Site 03
Van Buren, AR
Low Hazard 70 ftFrequently Asked Questions
What is the hazard classification of E Fork Pt Remove Creek Wid Site 04?
E Fork Pt Remove Creek Wid Site 04 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates E Fork Pt Remove Creek Wid Site 04?
E Fork Pt Remove Creek Wid Site 04 is owned by POINT REMOVE CREEK WATERSHED IMPROVEMENT DISTRICT (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was E Fork Pt Remove Creek Wid Site 04 built?
E Fork Pt Remove Creek Wid Site 04 was completed in 1967, making it 59 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of E Fork Pt Remove Creek Wid Site 04?
E Fork Pt Remove Creek Wid Site 04 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is E Fork Pt Remove Creek Wid Site 04?
E Fork Pt Remove Creek Wid Site 04 has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was E Fork Pt Remove Creek Wid Site 04 last inspected?
E Fork Pt Remove Creek Wid Site 04 was last inspected on July 29, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.