Dutchman Creek WS Dam #17

Dutchman Creek· Davie, North Carolina· Built 1985· Earth·
High Hazard Flood Risk Reduction Local Government

Key Takeaway

Dutchman Creek WS Dam #17 is classified as high hazard in North Carolina. It was completed in 1985 and is 41 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Length12,350 ft
Dam TypeEarth
Max Storage5.1K acre-ft
Normal Storage602 acre-ft
Surface Area97 acres
Drainage Area8,393 sq mi
Max Discharge10,522 cfs
Year Completed1985 (41 years old)
NID IDNC02253

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: February 11, 2021
State Regulated: Yes
Regulatory Agency: NCDEQ, DEMLR, Dam Safety Program

Ownership

Davie County Watershed Improvement Commission

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Dutchman Creek WS Dam #17?

Dutchman Creek WS Dam #17 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Dutchman Creek WS Dam #17?

Dutchman Creek WS Dam #17 is owned by Davie County Watershed Improvement Commission (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Dutchman Creek WS Dam #17 built?

Dutchman Creek WS Dam #17 was completed in 1985, making it 41 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Dutchman Creek WS Dam #17?

Dutchman Creek WS Dam #17 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Dutchman Creek WS Dam #17 last inspected?

Dutchman Creek WS Dam #17 was last inspected on February 11, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.