Decozen'S Dam is classified as significant hazard in New Jersey. It was completed in 1954 and is 72 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 11 ft (taller than 25.9% in NJ) |
| Dam Length | 250 ft |
| Dam Type | Earth |
| Max Storage | 48 acre-ft |
| Normal Storage | 38 acre-ft |
| Surface Area | 10 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 48 cfs |
| Year Completed | 1954 (72 years old) |
| NID ID | NJ00353 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Ferring Pharmaceuticals, Inc.
Private
Nearby Dams
Mountain Lake Dam
Morris, NJ
High Hazard 15 ftManor Lake Dam
Morris, NJ
Significant Hazard 5 ftSunset Lake Dam
Morris, NJ
High Hazard 8 ftCrystal Lake Dam
Morris, NJ
High Hazard 16 ftRainbow Lakes Dam
Morris, NJ
High Hazard 11 ftLake Parsippany West Dike #1
Morris, NJ
High Hazard 8 ftWildwood Lake Dam
Morris, NJ
High Hazard 13 ftLake Parsippany East Dike No. 2
Morris, NJ
High Hazard 5 ftFrequently Asked Questions
What is the hazard classification of Decozen'S Dam?
Decozen'S Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Decozen'S Dam?
Decozen'S Dam is owned by Ferring Pharmaceuticals, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Decozen'S Dam built?
Decozen'S Dam was completed in 1954, making it 72 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Decozen'S Dam?
Decozen'S Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Decozen'S Dam?
Decozen'S Dam has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Decozen'S Dam last inspected?