Davis-Battle Cr. Watershed Site G-1
Key Takeaway
Davis-Battle Cr. Watershed Site G-1 is classified as low hazard in Iowa. It was completed in 1966 and is 60 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 40 ft (taller than 84% in IA) |
| Dam Length | 398 ft |
| Dam Type | Earth |
| Max Storage | 98 acre-ft |
| Normal Storage | 67 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1966 (60 years old) |
| NID ID | IA00729 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Monona County SWCD
Local Government
Nearby Dams
Davis-Battle Cr. Watershed Site G-2
Monona, IA
Low Hazard 27 ftDavis-Battle Cr. Watershed Site D-7
Monona, IA
Low Hazard 35 ftDavis-Battle Cr. Watershed Site H-1
Monona, IA
Low Hazard 38 ftDavis-Battle Cr. Watershed Site D-1
Monona, IA
Low Hazard 43 ftDavis-Battle Cr. Watershed Site D-3
Monona, IA
Low Hazard 46 ftMonona County Roadgrade Dam 13-83-43
Monona, IA
Low Hazard 34 ftDavis-Battle Cr. Watershed Site H-4-4
Monona, IA
Low Hazard 51 ftDavis-Battle Cr. Watershed Site H-3
Monona, IA
Low Hazard 42 ftFrequently Asked Questions
What is the hazard classification of Davis-Battle Cr. Watershed Site G-1?
Davis-Battle Cr. Watershed Site G-1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Davis-Battle Cr. Watershed Site G-1?
Davis-Battle Cr. Watershed Site G-1 is owned by Monona County SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Davis-Battle Cr. Watershed Site G-1 built?
Davis-Battle Cr. Watershed Site G-1 was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Davis-Battle Cr. Watershed Site G-1?
Davis-Battle Cr. Watershed Site G-1 serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Davis-Battle Cr. Watershed Site G-1?
Davis-Battle Cr. Watershed Site G-1 has a dam height of 40 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.