Davidsons Mill Pond Dam
Key Takeaway
Davidsons Mill Pond Dam is classified as significant hazard in New Jersey. It was completed in 1950 and is 76 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 17.8% in NJ) |
| Dam Length | 135 ft |
| Dam Type | Earth |
| Max Storage | 345 acre-ft |
| Normal Storage | 170 acre-ft |
| Surface Area | 28 acres |
| Drainage Area | 15 sq mi |
| Max Discharge | 5,000 cfs |
| Year Completed | 1950 (76 years old) |
| NID ID | NJ00516 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
New Brunswick City
Local Government
Nearby Dams
Farrington Dam
Middlesex, NJ
High Hazard 34 ftCranbury S. River Basin B1 Dam
Middlesex, NJ
Low Hazard 30 ftMill Pond Dam
Middlesex, NJ
Low Hazard 8 ftHelmetta Dam
Middlesex, NJ
Significant Hazard 7 ftManalapan Lake Dam
Middlesex, NJ
High Hazard 15 ftPrinceton Walk Dam
Middlesex, NJ
Significant Hazard 16 ftBrainerd Lake Dam
Middlesex, NJ
Significant Hazard 13 ftWestons Arch Dam
Middlesex, NJ
Significant Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Davidsons Mill Pond Dam?
Davidsons Mill Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Davidsons Mill Pond Dam?
Davidsons Mill Pond Dam is owned by New Brunswick City (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Davidsons Mill Pond Dam built?
Davidsons Mill Pond Dam was completed in 1950, making it 76 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Davidsons Mill Pond Dam?
Davidsons Mill Pond Dam serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Davidsons Mill Pond Dam?
Davidsons Mill Pond Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Davidsons Mill Pond Dam last inspected?
Davidsons Mill Pond Dam was last inspected on December 9, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.