Daniel Ryan
Key Takeaway
Daniel Ryan is classified as low hazard in Minnesota. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 31 ft (taller than 85% in MN) |
| Dam Length | 320 ft |
| Dam Type | Earth |
| Max Storage | 20 acre-ft |
| Normal Storage | 4 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 0 sq mi |
| NID ID | MN00951 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Ryan, Daniel
Private
Nearby Dams
Ryan-Lindell
Goodhue, MN
Low Hazard 28 ftBelle Creek R-5
Goodhue, MN
Low Hazard 37 ftBelle Creek S-2
Goodhue, MN
Low Hazard 18 ftBelle Creek S-3
Goodhue, MN
Low Hazard 32 ftPeaceful Valley Group No. 1
Goodhue, MN
Low Hazard 29 ftBelle Creek R-4
Goodhue, MN
Significant Hazard 52 ftBelle Creek R-1
Goodhue, MN
Significant Hazard 47 ftBelle Creek R-2
Goodhue, MN
Significant Hazard 55 ftFrequently Asked Questions
What is the hazard classification of Daniel Ryan?
Daniel Ryan is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Daniel Ryan?
Daniel Ryan is owned by Ryan, Daniel (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Daniel Ryan?
Daniel Ryan serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Daniel Ryan?
Daniel Ryan has a dam height of 31 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Daniel Ryan last inspected?
Daniel Ryan was last inspected on May 17, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.