Conner Jarvis East Pond
Key Takeaway
Conner Jarvis East Pond is classified as significant hazard in Washington. It was completed in 2018 and is 8 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 1,230 ft |
| Dam Type | Earth |
| Max Storage | 14 acre-ft |
| Normal Storage | 7 acre-ft |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 2018 (8 years old) |
| NID ID | WA02062 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Sammamish City Public Works
Local Government
Nearby Dams
Klahanie Stormwater Detention Dam No 1
King, WA
Significant HazardQueens Bog Dam
King, WA
Low HazardYellow Lake Outlet Dike
King, WA
High HazardKlahanie Stormwater Detention Dam No 13
King, WA
High HazardSouth Ridge Stormwater Detention Dam
King, WA
High HazardIssaquah Highlands Npe Pond
King, WA
High HazardIssaquah Highlands Falls Pond Dam
King, WA
High HazardIssaquah Highlands Np2 Pond Dam
King, WA
High HazardFrequently Asked Questions
What is the hazard classification of Conner Jarvis East Pond?
Conner Jarvis East Pond is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Conner Jarvis East Pond?
Conner Jarvis East Pond is owned by Sammamish City Public Works (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Conner Jarvis East Pond built?
Conner Jarvis East Pond was completed in 2018, making it 8 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Conner Jarvis East Pond?
Conner Jarvis East Pond serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Conner Jarvis East Pond last inspected?
Conner Jarvis East Pond was last inspected on December 31, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.