Cone Pond Dam
Key Takeaway
Cone Pond Dam is classified as high hazard in North Carolina. It was completed in 1989 and is 37 years old. Its primary use is fire protection. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 625 ft |
| Dam Type | Earth |
| Max Storage | 24 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1989 (37 years old) |
| NID ID | NC02595 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Daniel Cone
Private
Nearby Dams
Lambert Dam
Franklin, NC
High HazardEddins Pond Dam
Franklin, NC
Low HazardPerry Lake Dam
Franklin, NC
Low HazardHudson Dam
Wake, NC
Significant HazardJones Dam
Franklin, NC
Low HazardNewcomb Lagoon Dam
Franklin, NC
Significant HazardBunn Lake Dam
Franklin, NC
High HazardLands Lake Dam
Franklin, NC
High HazardFrequently Asked Questions
What is the hazard classification of Cone Pond Dam?
Cone Pond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cone Pond Dam?
Cone Pond Dam is owned by Daniel Cone (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cone Pond Dam built?
Cone Pond Dam was completed in 1989, making it 37 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cone Pond Dam?
Cone Pond Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Cone Pond Dam last inspected?
Cone Pond Dam was last inspected on February 22, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.