Key Takeaway
Cold River Site 1 Dam is classified as high hazard in New Hampshire. It was completed in 1969 and is 57 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 43 ft (taller than 93.4% in NH) |
| Dam Length | 1,080 ft |
| Dam Type | Earth |
| Max Storage | 1.4K acre-ft |
| Normal Storage | 110 acre-ft |
| Surface Area | 29 acres |
| Drainage Area | 3 sq mi |
| Max Discharge | 8,870 cfs |
| Year Completed | 1969 (57 years old) |
| NID ID | NH00479 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
NH DES WATER DIVISION
State Government
Nearby Dams
Colton Brook
Oxford, ME
Significant Hazard 34 ftMcdonough Brook
Oxford, ME
High Hazard 19 ftHeald Pond
Oxford, ME
Low Hazard 12 ftKezar Lake Outlet
Oxford, ME
Low Hazard 12 ftShelburne
Coos, NH
Low Hazard 17 ftGorham
Coos, NH
Low Hazard 20 ftKeewaydin Lake
Oxford, ME
Low Hazard 11 ftPatte Mill Dam
Oxford, ME
Low Hazard 13 ftFrequently Asked Questions
What is the hazard classification of Cold River Site 1 Dam?
Cold River Site 1 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cold River Site 1 Dam?
Cold River Site 1 Dam is owned by NH DES WATER DIVISION (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cold River Site 1 Dam built?
Cold River Site 1 Dam was completed in 1969, making it 57 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cold River Site 1 Dam?
Cold River Site 1 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cold River Site 1 Dam?
Cold River Site 1 Dam has a dam height of 43 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cold River Site 1 Dam last inspected?
Cold River Site 1 Dam was last inspected on October 18, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.