Churchill Club Subdivision Basin D Dam
Key Takeaway
Churchill Club Subdivision Basin D Dam is classified as low hazard in Illinois. It was completed in 2004 and is 22 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 7 ft (taller than 0.5% in IL) |
| Dam Length | 40 ft |
| Dam Type | Concrete |
| Max Storage | 160 acre-ft |
| Normal Storage | 8 acre-ft |
| Surface Area | 20 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 1,000 cfs |
| Year Completed | 2004 (22 years old) |
| NID ID | IL50534 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
VILLAGE OF OSWEGO
Local Government
Nearby Dams
Churchill Club Dam Basin B Dam
Kendall, IL
Low Hazard 10 ftPrescott Mill Dam
Kendall, IL
Significant Hazard 7 ftMontgomery Dam
Kane, IL
Significant Hazard 7 ftAurora - West Dam
Kane, IL
Low Hazard 7 ftGrande Park Subdivision Detention As-7 Dam
Kendall, IL
Low Hazard 8 ftGlenn Circle West Dam
Will, IL
Low Hazard 7 ftGlenn Circle East Dam
Will, IL
Low Hazard 7 ftMillenium Parkway Dam
Will, IL
Low Hazard 10 ftFrequently Asked Questions
What is the hazard classification of Churchill Club Subdivision Basin D Dam?
Churchill Club Subdivision Basin D Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Churchill Club Subdivision Basin D Dam?
Churchill Club Subdivision Basin D Dam is owned by VILLAGE OF OSWEGO (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Churchill Club Subdivision Basin D Dam built?
Churchill Club Subdivision Basin D Dam was completed in 2004, making it 22 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Churchill Club Subdivision Basin D Dam?
Churchill Club Subdivision Basin D Dam serves the following purposes: Flood Risk Reduction, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Churchill Club Subdivision Basin D Dam?
Churchill Club Subdivision Basin D Dam has a dam height of 7 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Churchill Club Subdivision Basin D Dam last inspected?
Churchill Club Subdivision Basin D Dam was last inspected on November 1, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.