Chesapeake Bay Golf Club North East Dam
Key Takeaway
Chesapeake Bay Golf Club North East Dam is classified as significant hazard in Maryland. It was completed in 1990 and is 36 years old. Its primary use is irrigation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 25 ft (taller than 60.9% in MD) |
| Dam Length | 500 ft |
| Dam Type | Earth |
| Max Storage | 33 acre-ft |
| Normal Storage | 17 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 320 cfs |
| Year Completed | 1990 (36 years old) |
| Year Modified | 1990 |
| NID ID | MD00420 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
North East Developers, LLC
Private
Nearby Dams
York Bldg Products Settling Pond 12
Cecil, MD
Significant Hazard 70 ftYork Bldg Products Settling Pond 11
Cecil, MD
Significant Hazard 51 ftMason Dixon Original Settling Pond
Cecil, MD
Low Hazard 52 ftYork Bldg Products Settling Pond 10
Cecil, MD
Significant Hazard 48 ftYork Bldg Products Settling Pond 13
Cecil, MD
Significant Hazard 45 ftYork Bldg Products Settling Pond 9
Cecil, MD
Significant Hazard 43 ftYork Building Products Pond No. 7 Dam
Cecil, MD
Low Hazard 30 ftYork Building Products Pond No. 5
Cecil, MD
Low Hazard 44 ftFrequently Asked Questions
What is the hazard classification of Chesapeake Bay Golf Club North East Dam?
Chesapeake Bay Golf Club North East Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Chesapeake Bay Golf Club North East Dam?
Chesapeake Bay Golf Club North East Dam is owned by North East Developers, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Chesapeake Bay Golf Club North East Dam built?
Chesapeake Bay Golf Club North East Dam was completed in 1990, making it 36 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Chesapeake Bay Golf Club North East Dam?
Chesapeake Bay Golf Club North East Dam serves the following purposes: Irrigation, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Chesapeake Bay Golf Club North East Dam?
Chesapeake Bay Golf Club North East Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Chesapeake Bay Golf Club North East Dam last inspected?
Chesapeake Bay Golf Club North East Dam was last inspected on January 30, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.