Charlestown Ww Lagoon Dam is classified as significant hazard in New Hampshire. It was completed in 1995 and is 31 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 5 ft (taller than 0.3% in NH) |
| Dam Length | 2,200 ft |
| Dam Type | Earth |
| Max Storage | 17 acre-ft |
| Normal Storage | 6 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1995 (31 years old) |
| NID ID | NH01461 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TOWN OF CHARLESTOWN
Local Government
Nearby Dams
Muckross
Windsor, VT
Low Hazard 20 ftHall Pond Dam
Sullivan, NH
Low Hazard 9 ftHall Pond Dike
Sullivan, NH
Low Hazard 7 ftBellows Falls
Cheshire, NH
Low Hazard 48 ftComtu Falls
Windsor, VT
Significant Hazard 4 ftMinards Pond
Windham, VT
Significant Hazard 25 ftFellows
Windsor, VT
Low Hazard 10 ftVilas Pool Dam
Cheshire, NH
Significant Hazard 31 ftFrequently Asked Questions
What is the hazard classification of Charlestown Ww Lagoon Dam?
Charlestown Ww Lagoon Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Charlestown Ww Lagoon Dam?
Charlestown Ww Lagoon Dam is owned by TOWN OF CHARLESTOWN (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Charlestown Ww Lagoon Dam built?
Charlestown Ww Lagoon Dam was completed in 1995, making it 31 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Charlestown Ww Lagoon Dam?
Charlestown Ww Lagoon Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Charlestown Ww Lagoon Dam?
Charlestown Ww Lagoon Dam has a dam height of 5 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Charlestown Ww Lagoon Dam last inspected?
Charlestown Ww Lagoon Dam was last inspected on April 21, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.