Chalkers Millpond Dam
Key Takeaway
Chalkers Millpond Dam is classified as significant hazard in Connecticut. It was completed in 1845 and is 181 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 5 ft (taller than 5.1% in CT) |
| Dam Length | 325 ft |
| Dam Type | Earth |
| Max Storage | 55 acre-ft |
| Normal Storage | 55 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 46 cfs |
| Year Completed | 1845 (181 years old) |
| NID ID | CT00415 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Obed Heights Reservoir Dam
Middlesex, CT
High Hazard 15 ftTurnpike Pond Dam
Middlesex, CT
Significant Hazard 9 ftTiffany Brook Pond Dam
Middlesex, CT
Significant Hazard 4 ftBirch Mill Pond Dam
Middlesex, CT
Significant Hazard 9 ftMill Pond Dam
Middlesex, CT
High Hazard 18 ftIvoryton Pond (Aka Washburn) Dam
Middlesex, CT
Significant Hazard 8 ftComstock Pond Dam
Middlesex, CT
Low Hazard 7 ftWrights Pond Dam
Middlesex, CT
High Hazard 10 ftFrequently Asked Questions
What is the hazard classification of Chalkers Millpond Dam?
Chalkers Millpond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Chalkers Millpond Dam?
Chalkers Millpond Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Chalkers Millpond Dam built?
Chalkers Millpond Dam was completed in 1845, making it 181 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Chalkers Millpond Dam?
Chalkers Millpond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Chalkers Millpond Dam?
Chalkers Millpond Dam has a dam height of 5 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Chalkers Millpond Dam last inspected?
Chalkers Millpond Dam was last inspected on December 30, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.