Key Takeaway
Chalk Bluff Treatment Plant Phase I Dam is classified as significant hazard in Nevada. It was completed in 1995 and is 31 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 9.7% in NV) |
| Dam Length | 618 ft |
| Dam Type | Earth |
| Max Storage | 12 acre-ft |
| Normal Storage | 12 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 2 cfs |
| Year Completed | 1995 (31 years old) |
| NID ID | NV10361 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TRUCKEE MEADOWS WATER AUTHORITY
Public Utility
Nearby Dams
Chalk Bluff Treatment Plant Phase Ii Dam
Washoe, NV
Significant Hazard 12 ftChalk Bluff Solids Storage Pond Dam
Washoe, NV
Significant Hazard 21 ftHunter Creek Reservoir Dam
Washoe, NV
High Hazard 20 ftPeavine Creek Lower Dam
Washoe, NV
High Hazard 41 ftPeavine Creek Upper Dam
Washoe, NV
High Hazard 74 ftWest Wash Dam
Washoe, NV
High Hazard 66 ftNorthgate Golf Course Dam
Washoe, NV
High Hazard 30 ftEast Wash Diversion Dam
Washoe, NV
High Hazard 38 ftFrequently Asked Questions
What is the hazard classification of Chalk Bluff Treatment Plant Phase I Dam?
Chalk Bluff Treatment Plant Phase I Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Chalk Bluff Treatment Plant Phase I Dam?
Chalk Bluff Treatment Plant Phase I Dam is owned by TRUCKEE MEADOWS WATER AUTHORITY (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Chalk Bluff Treatment Plant Phase I Dam built?
Chalk Bluff Treatment Plant Phase I Dam was completed in 1995, making it 31 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Chalk Bluff Treatment Plant Phase I Dam?
Chalk Bluff Treatment Plant Phase I Dam serves the following purposes: Other, Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Chalk Bluff Treatment Plant Phase I Dam?
Chalk Bluff Treatment Plant Phase I Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Chalk Bluff Treatment Plant Phase I Dam last inspected?
Chalk Bluff Treatment Plant Phase I Dam was last inspected on June 26, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.