Centerville - Barnard Creek (Upper) Db
Key Takeaway
Centerville - Barnard Creek (Upper) Db is classified as high hazard in Utah. It was completed in 2000 and is 26 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 135 ft |
| Dam Type | Other |
| Normal Storage | 5 acre-ft |
| Drainage Area | 0 sq mi |
| Year Completed | 2000 (26 years old) |
| NID ID | UT00827 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DAVIS COUNTY FLOOD CONTROL
Private
Nearby Dams
Davis County -Barnard Creek (Lower) Db
Davis, UT
Significant HazardDavis County -Parrish Creek Db
Davis, UT
High HazardDeuel Creek
Davis, UT
High HazardDavis County -Ricks Creek Db
Davis, UT
High HazardCenterville -Deuel Creek Db
Davis, UT
Significant HazardCenterville Canyon Debris Basin
Davis, UT
High HazardCenterville City Erosion Dike
Davis, UT
Significant HazardFarmington Irrigation - Reservoir C
Davis, UT
High HazardFrequently Asked Questions
What is the hazard classification of Centerville - Barnard Creek (Upper) Db?
Centerville - Barnard Creek (Upper) Db is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Centerville - Barnard Creek (Upper) Db?
Centerville - Barnard Creek (Upper) Db is owned by DAVIS COUNTY FLOOD CONTROL (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Centerville - Barnard Creek (Upper) Db built?
Centerville - Barnard Creek (Upper) Db was completed in 2000, making it 26 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Centerville - Barnard Creek (Upper) Db?
Centerville - Barnard Creek (Upper) Db serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Centerville - Barnard Creek (Upper) Db last inspected?
Centerville - Barnard Creek (Upper) Db was last inspected on June 7, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.