Cedar-Piney Site 2
Key Takeaway
Cedar-Piney Site 2 is classified as high hazard in Arkansas. It was completed in 1986 and is 40 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 47 ft (taller than 80.8% in AR) |
| Dam Length | 900 ft |
| Dam Type | Earth |
| Max Storage | 3.4K acre-ft |
| Normal Storage | 145 acre-ft |
| Surface Area | 27 acres |
| Drainage Area | 3 sq mi |
| Max Discharge | 16,512 cfs |
| Year Completed | 1986 (40 years old) |
| NID ID | AR01406 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
YELL COUNTY SOIL AND WATER CONSERVATION DISTRICT
Local Government
Nearby Dams
Cedar-Piney Site 1
Yell, AR
High Hazard 64 ftJones Lake Dam No 1
Yell, AR
Low Hazard 15 ftCedar-Piney Creeks Watershed Site 3
Yell, AR
High Hazard 47 ftMoss Creek
Yell, AR
Low Hazard 12 ftSpring Lake
Yell, AR
High Hazard 59 ftChambers Lake Dam
Yell, AR
Low Hazard 29 ftBlue Mountain Dam
Yell, AR
High Hazard 115 ftBailey Branch Site 1
Yell, AR
Low Hazard 35 ftFrequently Asked Questions
What is the hazard classification of Cedar-Piney Site 2?
Cedar-Piney Site 2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cedar-Piney Site 2?
Cedar-Piney Site 2 is owned by YELL COUNTY SOIL AND WATER CONSERVATION DISTRICT (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cedar-Piney Site 2 built?
Cedar-Piney Site 2 was completed in 1986, making it 40 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cedar-Piney Site 2?
Cedar-Piney Site 2 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cedar-Piney Site 2?
Cedar-Piney Site 2 has a dam height of 47 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cedar-Piney Site 2 last inspected?
Cedar-Piney Site 2 was last inspected on February 28, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.