Canby R-4a

County Ditch 19-TR· Yellow Medicine, Minnesota· Built 1982· Earth· 41 ft tall
High Hazard Flood Risk Reduction Local Government

Key Takeaway

Canby R-4a is classified as high hazard in Minnesota. It was completed in 1982 and is 44 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 41 ft (taller than 94% in MN)
Dam Length1,200 ft
Dam TypeEarth
Max Storage770 acre-ft
Normal Storage82 acre-ft
Surface Area5 acres
Drainage Area2 sq mi
Max Discharge10,000 cfs
Year Completed1982 (44 years old)
NID IDMN01016

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: May 10, 2023
State Regulated: Yes
Regulatory Agency: MNDNR EWR

Ownership

WD of Lac Qui Parle-Yellow Bank

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Canby R-4a?

Canby R-4a is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Canby R-4a?

Canby R-4a is owned by WD of Lac Qui Parle-Yellow Bank (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Canby R-4a built?

Canby R-4a was completed in 1982, making it 44 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Canby R-4a?

Canby R-4a serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Canby R-4a?

Canby R-4a has a dam height of 41 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Canby R-4a last inspected?

Canby R-4a was last inspected on May 10, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.