Camp Inawendiwin Middle Dam
Key Takeaway
Camp Inawendiwin Middle Dam is classified as significant hazard in New Jersey. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 12 ft (taller than 31.2% in NJ) |
| Dam Length | 400 ft |
| Dam Type | Earth |
| Drainage Area | 5 sq mi |
| NID ID | NJ01020 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Girl Scouts of Central & Southern NJ, Inc.
Private
Nearby Dams
Old Forge Lake Dam
Burlington, NJ
Low Hazard 12 ftCedar Run Lake Dam
Burlington, NJ
Low Hazard 13 ftNew Jersey No Name # 17 Dam
Burlington, NJ
Low Hazard 10 ftNew Jersey No Name # 8 Dam
Burlington, NJ
Low Hazard 8 ftIndian Mills Dam
Burlington, NJ
Significant Hazard 11 ftVincentown Mill Dam
Burlington, NJ
High Hazard 12 ftLake Stockwell Dam
Burlington, NJ
Significant Hazard 12 ftStokes-Lower Dam
Burlington, NJ
Significant Hazard 8 ftFrequently Asked Questions
What is the hazard classification of Camp Inawendiwin Middle Dam?
Camp Inawendiwin Middle Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Camp Inawendiwin Middle Dam?
Camp Inawendiwin Middle Dam is owned by Girl Scouts of Central & Southern NJ, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
How tall is Camp Inawendiwin Middle Dam?
Camp Inawendiwin Middle Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Camp Inawendiwin Middle Dam last inspected?
Camp Inawendiwin Middle Dam was last inspected on February 17, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.