Key Takeaway
Camp Creek Subwatershed Site 10-1 is classified as low hazard in Iowa. It was completed in 1998 and is 28 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 37 ft (taller than 77.4% in IA) |
| Dam Length | 840 ft |
| Dam Type | Earth |
| Max Storage | 323 acre-ft |
| Normal Storage | 131 acre-ft |
| Surface Area | 15 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1998 (28 years old) |
| NID ID | IA03242 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Woodbury County SWCD
Local Government
Nearby Dams
Camp Creek Subwatershed Site M-4
Woodbury, IA
Low Hazard 44 ftCamp Creek Subwatershed Site M-6a
Woodbury, IA
Low Hazard 38 ftCamp Creek Subwatershed Site 1-2
Woodbury, IA
Low Hazard 40 ftCamp Creek Subwatershed Site M-2a
Woodbury, IA
Low Hazard 46 ftCamp Creek Subwatershed Site M-8
Woodbury, IA
Low Hazard 27 ftWindy Hill Subwatershed Site 3-2
Woodbury, IA
Low Hazard 42 ftHeisler Creek Subwtrshd Sta 46+80 #3d
Woodbury, IA
Low Hazard 34 ftWindy Hill Subwatershed Site 3d-2
Woodbury, IA
Low Hazard 33 ftFrequently Asked Questions
What is the hazard classification of Camp Creek Subwatershed Site 10-1?
Camp Creek Subwatershed Site 10-1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Camp Creek Subwatershed Site 10-1?
Camp Creek Subwatershed Site 10-1 is owned by Woodbury County SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Camp Creek Subwatershed Site 10-1 built?
Camp Creek Subwatershed Site 10-1 was completed in 1998, making it 28 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Camp Creek Subwatershed Site 10-1?
Camp Creek Subwatershed Site 10-1 serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Camp Creek Subwatershed Site 10-1?
Camp Creek Subwatershed Site 10-1 has a dam height of 37 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.